[{"data":1,"prerenderedAt":117},["ShallowReactive",2],{"page-highway-engineering":3},{"id":4,"slug":5,"title":6,"content":7,"meta_title":109,"meta_description":110,"published":111,"published_at":112,"updated_at":113,"is_home":114,"parent_id":115,"meta":116},"724faffa-53c3-4191-acf7-170bf5a67431","highway-engineering","Highway engineering",{"meta":8,"blocks":10},{"ogImage":9},"https:\u002F\u002Fsktegczfmabucrnpgrvp.supabase.co\u002Fstorage\u002Fv1\u002Fobject\u002Fpublic\u002Fmedia\u002F39a2e898-428f-4239-9cc7-a16b62043e77\u002Fsurvey-setting-out.webp",[11,27,38,55,63,87,102],{"id":12,"data":13,"type":26},"highway-hero",{"lead":14,"image":9,"title":6,"kicker":15,"primary":16,"variant":19,"imageAlt":20,"secondary":21,"imageWidth":24,"imageHeight":25},"Approved by Hull City Council and East Riding of Yorkshire Council for new and remedial work on the adopted highway. Section 278 and Section 38 schemes built to adoption standard.","Service",{"href":17,"label":18},"\u002Fcontact-us","Send an enquiry","page","Two Roche engineers setting out with a total station and GPS pole on open ground, a Roche pickup behind",{"href":22,"label":23},"tel:+441482648731","Call 01482 648731",2000,1333,"hero",{"id":28,"data":29,"type":37},"highway-prose",{"html":30,"aside":31},"\n\u003Ch2>Section 278 and Section 38 works\u003C\u002Fh2>\n\u003Cp>We build the highway works that get developments adopted: junctions, accesses, footways, kerb lines and highway drainage, set out and built to the council's specification and inspected as we go.\u003C\u002Fp>\n\u003Cp>Our contract managers run each scheme from start to finish, and a director stays involved throughout. That matters when you're working to a planning condition or a handover date.\u003C\u002Fp>\n\u003Ch2>Small works that get the Final Certificate issued\u003C\u002Fh2>\n\u003Cp>Developers often reach the end of a scheme with a short list of remedial items between them and adoption. We're good at those jobs. They get programmed quickly and done properly first time, so the council can issue the Final Certificate.\u003C\u002Fp>\n\u003Ch2>What we do on the highway\u003C\u002Fh2>\n\u003Cul>\n\u003Cli>Section 278 junctions, accesses and footway changes\u003C\u002Fli>\n\u003Cli>Section 38 estate roads built to adoptable standard\u003C\u002Fli>\n\u003Cli>Footway construction and widening\u003C\u002Fli>\n\u003Cli>Kerb and channel replacement\u003C\u002Fli>\n\u003Cli>Highway drainage and gully replacement\u003C\u002Fli>\n\u003Cli>Remedial works for adoption\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp>When thieves took more than 250 gully lids across the Wakefield area, Wakefield Council appointed us to reinstate them with anti-theft lids. It's the kind of quick, practical highway work councils keep coming back to us for.\u003C\u002Fp>\n",{"lines":32,"title":36},[33,34,35],"Hull City Council","East Riding of Yorkshire Council","Street Works qualified supervisors and operatives","Approved to work on the adopted highway","prose",{"id":39,"data":40,"type":54},"361171bd-b524-4124-8662-9aa78b185572",{"title":41,"photos":42},"Recent highway work",[43,48,51],{"image":44,"imageAlt":45,"imageWidth":46,"imageHeight":47},"https:\u002F\u002Fsktegczfmabucrnpgrvp.supabase.co\u002Fstorage\u002Fv1\u002Fobject\u002Fpublic\u002Fmedia\u002F39a2e898-428f-4239-9cc7-a16b62043e77\u002Frecent-work\u002Fhighway-zebra-crossing-cycle-lane.webp","Newly laid zebra crossing with a green surfaced cycle lane",2400,1800,{"image":49,"imageAlt":50,"imageWidth":46,"imageHeight":47},"https:\u002F\u002Fsktegczfmabucrnpgrvp.supabase.co\u002Fstorage\u002Fv1\u002Fobject\u002Fpublic\u002Fmedia\u002F39a2e898-428f-4239-9cc7-a16b62043e77\u002Frecent-work\u002Fhighway-green-cycle-lane.webp","Resurfaced road with a new green cycle lane and white lining",{"image":52,"imageAlt":53,"imageWidth":46,"imageHeight":47},"https:\u002F\u002Fsktegczfmabucrnpgrvp.supabase.co\u002Fstorage\u002Fv1\u002Fobject\u002Fpublic\u002Fmedia\u002F39a2e898-428f-4239-9cc7-a16b62043e77\u002Frecent-work\u002Fhighway-junction-resurfacing.webp","Freshly resurfaced junction with new road markings","gallery",{"id":56,"data":57,"type":62},"highway-projects",{"link":58,"title":61,"service":6},{"href":59,"label":60},"\u002Fprojects","See all projects","Schemes we've delivered","project_grid",{"id":64,"data":65,"type":86},"highway-quotes",{"link":66,"items":69,"title":85},{"href":67,"label":68},"\u002Ftestimonials","Read every testimonial",[70,73,76,79,82],{"org":71,"quote":72},"Hessle Town Council","Staff always very professional and courteous.",{"org":74,"quote":75},"Newland School for Girls","Staff was very pleasant and met our needs. Work carried out by Roche was very good.",{"org":77,"quote":78},"North Point Shopping Centre","The usual high standard of workmanship and service.",{"org":80,"quote":81},"Mason Clark Associates","Your performance generally has enabled Mason Clark to achieve a high rating from our client.",{"org":83,"quote":84},"Littlefair Ltd","The ability to arrange a timescale around YW inspections was well appreciated and impressive, thanks.","From the people we've built for","testimonials",{"id":88,"data":89,"type":101},"highway-faq",{"items":90,"title":100},[91,94,97],{"a":92,"q":93},"An agreement under the Highways Act 1980 that lets a developer alter an existing public road to serve a development, such as a new junction, access or footway. The work must be built to the highway authority's standard by an approved contractor.","What is a Section 278 agreement?",{"a":95,"q":96},"An agreement for the council to adopt a new road a developer builds. Once it's built to standard and any remedial items are cleared, the council issues the Final Certificate and takes over maintenance.","What is a Section 38 agreement?",{"a":98,"q":99},"Yes. Send us the council's list of outstanding items and we'll price and programme them. Small remedial packages are a regular part of our work.","Can you help close out an adoption that has stalled?","Common questions","faq",{"id":103,"data":104,"type":108},"highway-cta",{"body":105,"title":106,"primary":107},"Send drawings, a site address or just a rough idea. A director will come back to you, usually the same day.","Talk to us about your scheme",{"href":17,"label":18},"cta","Section 278 & 38 Highway Contractor, Hull & East Yorkshire","Council-approved highway contractor in Hessle. Section 278 and Section 38 works, footways, kerbs and remedial works for adoption across Hull and East Yorkshire.",true,"2026-11-10T13:11:30.338+00:00","2026-11-10T16:43:36.34702+00:00",false,null,{"title":109,"description":110,"ogTitle":109,"ogDescription":110,"ogImage":9},1794330960652]