Skip to content

Service

Highway engineering

Approved by Hull City Council and East Riding of Yorkshire Council for new and remedial work on the adopted highway. Section 278 and Section 38 schemes built to adoption standard.

Two Roche engineers setting out with a total station and GPS pole on open ground, a Roche pickup behind

Section 278 and Section 38 works

We build the highway works that get developments adopted: junctions, accesses, footways, kerb lines and highway drainage, set out and built to the council's specification and inspected as we go.

Our contract managers run each scheme from start to finish, and a director stays involved throughout. That matters when you're working to a planning condition or a handover date.

Small works that get the Final Certificate issued

Developers often reach the end of a scheme with a short list of remedial items between them and adoption. We're good at those jobs. They get programmed quickly and done properly first time, so the council can issue the Final Certificate.

What we do on the highway

  • Section 278 junctions, accesses and footway changes
  • Section 38 estate roads built to adoptable standard
  • Footway construction and widening
  • Kerb and channel replacement
  • Highway drainage and gully replacement
  • Remedial works for adoption

When thieves took more than 250 gully lids across the Wakefield area, Wakefield Council appointed us to reinstate them with anti-theft lids. It's the kind of quick, practical highway work councils keep coming back to us for.

Recent highway work

Newly laid zebra crossing with a green surfaced cycle lane
Resurfaced road with a new green cycle lane and white lining
Freshly resurfaced junction with new road markings

Schemes we've delivered

See all projects
  • A new kerb line and fresh black surfacing behind orange Chapter 8 barriers on a tree-lined Hull terrace

    Highway engineering

    Kerb and channel replacement

    Telford Street, Hull

  • New block-paved footway and planters running alongside the glazed frontage of Wilberforce Health Centre

    Highway engineering

    Section 278 works

    Wilberforce Health Centre, Hull

  • Ducts laid in an open trench beside a new footpath and Heras fencing at Bridgehead Business Park

    Highway engineering

    Footpath construction

    Bridgehead Business Park, Hessle

From the people we've built for

Read every testimonial
Staff always very professional and courteous.
Hessle Town Council
  • Staff was very pleasant and met our needs. Work carried out by Roche was very good.
    Newland School for Girls
  • The usual high standard of workmanship and service.
    North Point Shopping Centre
  • Your performance generally has enabled Mason Clark to achieve a high rating from our client.
    Mason Clark Associates
  • The ability to arrange a timescale around YW inspections was well appreciated and impressive, thanks.
    Littlefair Ltd

Common questions

What is a Section 278 agreement?

An agreement under the Highways Act 1980 that lets a developer alter an existing public road to serve a development, such as a new junction, access or footway. The work must be built to the highway authority's standard by an approved contractor.

What is a Section 38 agreement?

An agreement for the council to adopt a new road a developer builds. Once it's built to standard and any remedial items are cleared, the council issues the Final Certificate and takes over maintenance.

Can you help close out an adoption that has stalled?

Yes. Send us the council's list of outstanding items and we'll price and programme them. Small remedial packages are a regular part of our work.

Talk to us about your scheme

Send drawings, a site address or just a rough idea. A director will come back to you, usually the same day.

Call the office 01482 648731