Skip to content

Our work

Projects

Schemes delivered for universities, health centres, councils, manufacturers and private clients across Hull and Yorkshire.

Featured schemes

  • Black geocellular attenuation crates and white geotextile laid in a long excavation, with operatives working at the far end

    Flood improvement works

    Storm attenuation tanks

    Summerbridge Doors, Anlaby

  • A new kerb line and fresh black surfacing behind orange Chapter 8 barriers on a tree-lined Hull terrace

    Highway engineering

    Kerb and channel replacement

    Telford Street, Hull

  • New block-paved footway and planters running alongside the glazed frontage of Wilberforce Health Centre

    Highway engineering

    Section 278 works

    Wilberforce Health Centre, Hull

  • Newly surfaced Tadcaster car park with crisp white bay and exit markings, parked cars and brick buildings behind

    Asphalt and macadam surfacing

    Central car park

    Central Car Park, Tadcaster

  • Concrete mixer discharging onto a fresh slab inside a large steel-framed industrial building

    Reinforced concrete

    Reinforced concrete slab

    Summerbridge Doors, Anlaby

  • Freshly surfaced access road leading to a blue-hoarded site entrance on the University of Hull campus

    Groundworks and foundations

    Enabling works

    University of Hull, Hull

  • Open duct trench along a roadside verge guarded by cones and orange barriers on Brighton Street, Hull

    Drainage and ducting

    Telecom ducting

    Brighton Street, Hull

  • Ducts laid in an open trench beside a new footpath and Heras fencing at Bridgehead Business Park

    Highway engineering

    Footpath construction

    Bridgehead Business Park, Hessle

Schedule of works

Every scheme on this page, at a glance.

  • Storm attenuation tanks

    Summerbridge Doors, Anlaby

    Geocellular attenuation tanks wrapped in membrane and geotextile beneath a new industrial unit's yard.

    Flood improvement works
  • Kerb and channel replacement

    Telford Street, Hull

    Kerb line and channel replaced along a residential street, with the carriageway edge resurfaced.

    Highway engineering
  • Section 278 works

    Wilberforce Health Centre, Hull

    Footway, paving and access works on the adopted highway outside the new health centre.

    Highway engineering
  • Central car park

    Central Car Park, Tadcaster

    Town-centre car park resurfaced and relined, with new exit markings.

    Asphalt and macadam surfacing
  • Reinforced concrete slab

    Summerbridge Doors, Anlaby

    Ground-bearing reinforced slab poured inside the new steel-framed production building.

    Reinforced concrete
  • Enabling works

    University of Hull, Hull

    New site entrance and access surfacing laid ahead of construction on campus.

    Groundworks and foundations
  • Telecom ducting

    Brighton Street, Hull

    Telecoms duct run installed along the verge under traffic management.

    Drainage and ducting
  • Footpath construction

    Bridgehead Business Park, Hessle

    New footpath with service ducts laid alongside the business park road.

    Highway engineering

Have a scheme like these?

Send drawings, a site address or just a rough idea. A director will come back to you, usually the same day.

Call the office 01482 648731